Solar professional at work in South Florida

Panels, batteries & energy storage

Trusted Solar Professionals

Compare verified local solar professionals, view recent projects, read homeowner reviews, and request multiple quotes.

Florida sun is an asset, and solar finally prices like one. Guild solar professionals model production honestly, handle FPL interconnection, and won't sell you a system your roof can't carry.

Verified professionals
2

Verified professionals

Average homeowner rating
4.7★

Average homeowner rating

Completed projects
816+

Completed projects

Cities served
8

Cities served

  • ★★★★★ Homeowner Rated
  • Verified Professionals
  • Licensed & Insured
  • Background Checked
  • Exclusive Partners

Guild members

Featured solar professionals

Exclusive Partners appear first, followed by verified Guild members — every one license-checked, insured and background screened.

Recent work

Solar projects completed nearby

Real scopes delivered by Guild members across South Florida. Select a project to open the photo gallery.

Budget guidance

What solar typically costs

Solar pricing is quoted per watt before incentives. Roof age matters — replacing a roof under an installed array costs far more than doing both at once.

6 kW System

$16,000 – $22,000

Timeline
1 – 2 days install
Typical ROI
30% federal tax credit

Before incentives; permit and interconnection.

10 kW System

$25,000 – $34,000

Timeline
2 – 3 days install
Typical ROI
7 – 11 yr payback

Typical for all-electric Weston homes.

Home Battery (13 kWh)

$11,000 – $18,000

Timeline
1 day
Typical ROI
Outage resilience

Eligible for federal credit with solar.

Pool Solar Heating

$4,500 – $8,500

Timeline
1 – 2 days
Typical ROI
Near-zero heating cost

Roof-mounted collectors and controller.

Figures are educational estimates for South Florida homes and are not quotes. Your written proposal from a Guild member is the only accurate number.

How it works

Seven steps, no surprises

The same process every Guild solar professional follows, from first call to warranty support.

  1. Step 1Request QuoteShare your project in under two minutes.
  2. Step 2Free EstimateAn on-site visit at no cost, no obligation.
  3. Step 3ProposalItemized, written, and fixed before work begins.
  4. Step 4SchedulingA start date you choose, confirmed in writing.
  5. Step 5InstallationIn-house crews, protected floors, daily clean-up.
  6. Step 6Final WalkthroughNothing signs off until you're satisfied.
  7. Step 7Warranty SupportWritten workmanship warranty and direct escalation.

Resource Center

Solar guides for homeowners

Answers

Solar questions homeowners ask

Is solar worth it in South Florida?

For homes with high summer bills, southern or western roof exposure and a roof under ten years old, payback is commonly seven to eleven years against a system life of twenty-five.

What incentives are available?

The 30% federal residential clean energy credit applies to solar and paired batteries. Florida also exempts solar equipment from sales tax and from added property tax assessment.

Do I still get a power bill?

Yes — a minimum utility charge remains. Net metering credits your excess production against your consumption over the billing cycle.

Should I replace my roof first?

If your roof has under ten years left, replace it first or do both together. Removing and re-setting an array later costs thousands.

Does solar work during an outage?

Only with a battery or hybrid inverter. A standard grid-tied system shuts down during an outage for line-worker safety.

How long does approval take?

Installation is one to three days, but permitting and utility interconnection typically add four to ten weeks.