European-inspired custom kitchens designed for Weston's largest homes.
Only one Exclusive Partner is available per service category in each city.

Design, cabinetry & full build
Compare verified local kitchen remodeling professionals, view recent projects, read homeowner reviews, and request multiple quotes.
A kitchen remodel is the highest-stakes project most homeowners take on. Guild remodelers work from real drawings, fixed written scopes, and a schedule you can plan a family around.
Verified professionals
Average homeowner rating
Completed projects
Cities served
Guild members
Exclusive Partners appear first, followed by verified Guild members — every one license-checked, insured and background screened.
European-inspired custom kitchens designed for Weston's largest homes.
Only one Exclusive Partner is available per service category in each city.
Turn-key Weston kitchen renovations with in-house design and one project manager.
Coastal and transitional kitchen design for Weston homes.
Recent work
Real scopes delivered by Guild members across South Florida. Select a project to open the photo gallery.
Budget guidance
Cabinetry is typically 35 – 45% of a kitchen budget. Moving plumbing or removing a load-bearing wall adds both cost and permitting time.
$14,000 – $28,000
Counters, backsplash, refinished cabinets.
$45,000 – $80,000
New cabinetry, quartz, appliances, lighting.
$90,000 – $180,000
Custom millwork, stone slab, panel appliances.
$6,500 – $18,000
Engineering, beam, permit, finishes.
How it works
The same process every Guild kitchen remodeling professional follows, from first call to warranty support.
Resource Center
Answers
Plan on six to ten weeks for a full remodel. Guild remodelers typically set up a temporary prep station and sequence appliances so you're not without a sink the entire time.
Most full remodels here land between $45,000 and $80,000. Custom cabinetry, slab stone and appliance packages push it higher.
Yes if you move plumbing, electrical or walls. A pure cosmetic swap of counters and doors generally does not require one.
Semi-custom covers most layouts at meaningfully lower cost. Go custom when you have unusual ceiling heights, angled walls, or specific storage requirements.
Before demolition. Lead times on stone, tile and appliances drive the schedule more than labor does.
Every Guild remodeler documents changes in writing with cost and schedule impact before proceeding. Verbal change orders are the single biggest source of remodel disputes.
Coverage
Describe your project once. We'll route it to licensed Guild members who do this work every week.